Basin Creek Power Plant

Pioneer along with ICS designed and constructed the water and sewer utilities associated with the Basin Creek Power Plant, a natural gas power generation facility. Work included, fire-flow testing of the existing municipal water distribution system, determining the demand requirements for the power plant, impacts to municipal sewage system, developing plan and profile construction drawings for the project, and receiving approval from regulatory agencies. ICS installed the system to Montana Public Works specifications. Pioneer provided quality assurance testing, including compaction specifications, and pressure testing requirements. Throughout design and construction, Pioneer and ICS worked closely together to provide cost savings to our client while assuring the project was constructed to the standards expected by the Montana Public Works and City and County of Butte-Silver Bow.